Do You Have to Tell Your Network Operator?

Yes, it's mandatory, free, and quick. Do it before you plug in.

The short answer

Yes, you must register your plug-in solar kit with your network operator (DNO). It's free. Use myplugin.solar or your DNO's Form B2. Do it before you plug in. Sources differ: the network rule says before or within 28 days, but ENWL says before. You must tell them again when you remove it.

Plugging in a solar panel feels like a one-person job. It isn't quite. There's one short form you have to complete. It's free, and it's not optional. The process is now confirmed, so here are the steps.

What is a DNO?

A DNO is a distribution network operator. It's the company that owns and runs the electricity wires and cables in your area. It's not the same as your energy supplier, the company that bills you. Your DNO is set by where you live, not by who you choose.

How do I register my plug-in solar kit?

There are two routes. The first is myplugin.solar, the online journey run by the Energy Networks Association (ENA), the body that speaks for the network operators. The second is Form B2, a short form from your own DNO, called the Installation Document for a Plug-in Microgenerator. Ofgem, the energy regulator, approved Form B2 in August 2026. The ENA runs myplugin.solar as the online route. We could not open the ENA site ourselves, so check what it asks for when you get there.

What do I need to register?

Have these ready: your name, your address and postcode, and the make and model of your kit. The model should have a reference number on the ENA Type Test Register, the list of approved kits. Form B2 asks for more. It wants your MPAN (the long number on your electricity bill that identifies your meter) and details of any solar you already have. It also asks for the kit's registered capacity in kW. Our guide to adding a kit to existing panels explains that part. We found no fee anywhere. It's free.

When must I register: before or after plugging in?

Before you plug in. The sources differ on the deadline, so here they are. The network rule (G98) says before commissioning, or no later than 28 days after. Electricity North West says to register before you use it. Which? and the London Fire Brigade both say within 28 days. The safe move is to register first and plug in second. Then you meet every version.

Do I have to tell them when I remove it?

Yes. The rules require a notice when you connect the kit and another when you disconnect it. If you move house or swap the kit, tell your DNO. Remember too that you can only have one kit per household. That's the network rule, and it beats the product spec's looser one-per-circuit wording. Our 800 W rule guide has the detail.

Is this the same as the kit being "approved"?

No, and this trips people up. A maker must register a plug-in solar device on the ENA Type Test Register before selling it. That's about the product. Telling your DNO is a separate step you do yourself, about your own connection. Both steps are required. And in Northern Ireland this process does not apply yet. See our Northern Ireland guide.

Sunny says
Sunny says: take a screenshot of your confirmation, or note the date and any reference number. If you move house or swap the kit later, you'll want it. Registering after you plug in also means admitting the panel got there first.

The quick version

Common questions

Do I have to tell my network operator about plug-in solar?

Yes. Under the network rules, you must register a plug-in solar kit with your distribution network operator (DNO). Every compliant product must also carry a statement saying so, with a link to instructions. It's free.

What is a DNO?

A DNO, or distribution network operator, is the company that owns the electricity wires and cables in your area. It also maintains them. It's different from your energy supplier, which is the company you pay for your power. You can find yours by postcode through the Energy Networks Association.

How long do I have to register plug-in solar?

Sources differ. The network rule (G98) says before you commission the kit, or no later than 28 days after. Which? and the London Fire Brigade say within 28 days. Electricity North West says before you use it. Register before you plug in and you are safe under all of them.

Do I need to notify my DNO if I remove the panel?

Yes. You must tell your DNO when you connect a plug-in solar device, and again when you disconnect it. Your DNO needs an accurate record of what's connected to the network at any time.

Is DNO notification the same as the kit being certified?

No. Makers must register a compliant device on the ENA Type Test Register before it goes on sale. That's about the product. Telling your DNO about your own connection is a separate step. You take that step yourself when you install or remove the device.

Where this comes from

Last checked 12 October 2026. How we check our facts

Ready for honest quotes?
Get matched with vetted MCS-certified installers — you compare and choose.
Get quotes